This paper describes a BOG re-liquefaction system developed by Tractebel Gas Engineering (TGE) and the operations and economics of implementing the scheme onboard a 200,000 m³ ship(10pp)
This paper outlines the development history of reliquifaction systems, from the patented concept to the refined units that are currently being offered. (17pp)
This paper sets out the design criteria for a ‘retrofit’ plant and the optimum solutions found in a combined approach between plant designer and equipment supplier. (20pp)